The user research report exists, and the product manager's hero-product plan exists — but whether the direction is right, whether engineering can deliver it, and what target the boss should set need a professional review that takes no sides.
Before green-lighting a new product, run two rounds of Agent scrutiny: round one, drop the dozens of pages of user-interview reports on it and get a comparative call on which direction to build, a development timeline, and a business model in minutes; round two, once the product manager's hero-product plan lands, drop that in too — it reviews the engineering challenges, estimates effort, and sets targets and acceptance gates from the owner's seat.
Reads research and plans, compares directions on pain intensity × price point × competitive whitespace, estimates timelines and effort, gives scenario-based business models, flags engineering contradictions, sets acceptance gates.
Rules for new-product review:
The boss uploads dozens of pages of user-research PDF with three business questions.
The Agent reads it in minutes: a direction comparison matrix plus the key correction signal (users don't want a more extreme design; they want the balance of experience and looks).
Backward-plans the development timeline and flags the design-freeze gate date; the business model comes in conservative / base / optimistic scenarios with decision criteria.
When the product manager's plan lands, it reviews again: endorses the direction while flagging the core engineering contradiction the plan leaves unsolved (the category really needs differentiated structural design, not one spec maxed out).
Delivers a north-star target + three acceptance gates (pre-sale validates demand, no launch if real-world tests fail, restrained first order) + post-launch KPIs and a budget frame.
New interviews, plans, and revisions rerun the same flow.
A continuously updated pricing and feature comparison for the target category.
Designs for quantitative surveys and pre-sale product tests.
Distill the two rounds into a new-product green-light template: evidence → direction → timeline → model → gates.
Hand the engineering-contradiction list to the supply chain for item-by-item verification at first-sample stage, not after launch.
Bind the model's three scenarios to explicit actions: cut losses below the conservative line, reorder at the base line.